Day 9 - Wednesday 16 May - Work starts on installing the lateral drains
Having completed the installation of the main drainage pipe, collars were installed ready to be connected to the lateral drains. Then a special purpose piece of equipment, designed and built in the Mabbott workshops, was used to dig and lay the lateral drains.