Day 8 - Tuesday 15 May - 150mm drainage pipe installation

The soil layer has now been rolled to a smooth surface.   Much of the day was spent installing two 50m long,150mm diameter, drainage pipes on the southern side of the pitch.   Again GPS was used to set the level of the trench to allow for a fall from the eastern end to the chamber at the south-western corner of the pitch.   Whilst digging out the trench the team unexpectedly came across cables originally used for the old pitch lighting system.

No Comments

Start the ball rolling by posting a comment on this page!

Add a comment about this page

Your email address will not be published.